At the beginning of this year, a bit earlier than the agreed construction deadline, our firm has successfully completed the workload concerning the project “CONSTRUCTION OF THE “G” BARRIER” stretching to the height of 85.5 meters above sea level.

The “G” Barrier is a stone structure stretching across the entire width of the old river bed of the river Drava which was built for the purpose of a complete closure of the Osijek basin port on the upstream side. With the final completion of the “G” Barrier (the construction of another one – phase IV – is needed), the entire course of the Drava River will pass through the canal Nemetin.

The firm has carried out the construction of the “G” Barrier fully on its own. Over 18,000 m3 of broken stone was used for the completion of this phase of the “G” Barrier construction.

07/04/2016